Starbase activities (2025-02-28):
- Feb 27th cryo delivery tally.
- Feb 27th addendum: Pad B chopsticks testing timelapse from NSF.
- Massey's: Overnight, B16 rolls out to Massey's. (NSF, ViX, Starship Gazer)
- B16 performs a cryo test on the methane tank. (ViX)
- Build site: One of the cooling manifolds is lifted to launch mount B. (ViX)
- S32 scrapping continues, possibll completed. (ViX)
- Launch site: Another water tank arrives for Pad B. (ViX)
- Pad B chopstick testing continues. (ViX)
- B15 flight termination system installation and inspections. (NSF, ViX)
- New tank farm vapourizers are tested. (ViX)
- 1-hour road delay is posted for Mar 2nd, from 01:00 to 05:00 for transport from factory to pad.
- Another 1-hour road delay is posted, also for Mar 2nd, from 10:00 to 13:00 or 16:00 to 21:00 for transport from factory to pad. (S34 rollout?)
Flight 8:
- Starship can return to flight while the flight 7 mishap investigation remains open. (NSF / FAA (archive))
- At the pad, the yellow LR11000 crane begins to lower, and the black LR11000 crane will likely follow suit. (ViX 1, ViX 2)
McGregor:
- Test tank receives a can-crusher-style cap. (NSF / Anderson)