this post was submitted on 08 Feb 2025
34 points (100.0% liked)

Hardware

1048 readers
168 users here now

All things related to technology hardware, with a focus on computing hardware.


Rules (Click to Expand):

  1. Follow the Lemmy.world Rules - https://mastodon.world/about

  2. Be kind. No bullying, harassment, racism, sexism etc. against other users.

  3. No Spam, illegal content, or NSFW content.

  4. Please stay on topic, adjacent topics (e.g. software) are fine if they are strongly relevant to technology hardware. Another example would be business news for hardware-focused companies.

  5. Please try and post original sources when possible (as opposed to summaries).

  6. If posting an archived version of the article, please include a URL link to the original article in the body of the post.


Some other hardware communities across Lemmy:

Icon by "icon lauk" under CC BY 3.0

founded 2 years ago
MODERATORS
top 2 comments
sorted by: hot top controversial new old
[โ€“] [email protected] 4 points 6 days ago (1 children)

Amazon spent $75 billion in capital expenditure, mostly related to AWS, in 2024 and expects to fork out even more in the current calendar year. Similarly, Microsoft is projecting a spend of $80 billion in 2025 on infrastructure to train and deploy AI, and Meta some $60 billion on AI resources.

The total increase in capacity means that electricity grids will also require significant funding to keep pace

Maybe.

At Three Mile Island, Microsoft is sticking their datacenter next door to a nuclear power plant, so I'd expect that there isn't a lot that they're going to need to move.

If you figure that datacenter operators have a lot of flexibility in where to put their datacenters -- that they have few geographical constraints and can build them more-quickly than power plants can be constructed -- then I'd guess that those datacenters will probably tend to be put places that reliably have a lot of supply of power.

[โ€“] [email protected] 2 points 6 days ago

There is still the issue of overall baseload power supply in a given continent.

Not to mention political risk constraints in some places.