this post was submitted on 31 May 2024
44 points (95.8% liked)

[Dormant] Electric Vehicles (Moved to [email protected])

3196 readers
1 users here now

We have moved to:

[email protected]

A community for the sharing of links, news, and discussion related to Electric Vehicles.

Rules

  1. No bigotry - including racism, sexism, ableism, casteism, speciesism, homophobia, transphobia, or xenophobia.
  2. Be respectful, especially when disagreeing. Everyone should feel welcome here.
  3. No self-promotion.
  4. No irrelevant content. All posts must be relevant and related to plug-in electric vehicles โ€” BEVs or PHEVs.
  5. No trolling.
  6. Policy, not politics. Submissions and comments about effective policymaking are allowed and encouraged in the community, however conversations and submissions about parties, politicians, and those devolving into general tribalism will be removed.

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] [email protected] 1 points 8 months ago

I'm not trying to solve for anything except a unified connector. The upshot of which would be supporting all three phases of a three phase branch which is something that NACS mentions while only using two of the phases from a 480v system. Using all three means onboard chargers and connectors could be the same globally, and when using split phase power in north america, the onboard charger would still work completely fine but at a lower voltage.